国产伦精品一区二区三区网站,yellow中文字幕网,欧美另类一区,中文字字幕码一二三区

Transferred from-Mysteel: Tracking the production of the wrong peak of Tianjin Iron and Steel Enterprise

發(fā)布時間:[2019-1-12 9:23:49]    瀏覽量:3065次
[Introduction]
It is predicted that heavy pollution will occur in our city from January 11, 2019, in line with the yellow warning conditions for heavy pollution weather stipulated in the "Tianjin Heavy Pollution Weather Emergency Plan"(Tianjin Administrative Office Letter[2018] No. 65). A yellow warning of heavy pollution weather is hereby issued.
The people's governments of various districts and the responsible units are requested, in accordance with the division of responsibilities of the "Tianjin Heavy Pollution Weather Emergency Plan", to initiate Class III emergency response measures from 0:00 on January 11 to do a good job in dealing with heavy pollution weather.
[Survey sample profile]

1, the blast furnace survey sample selected a total of 7 parent flow steel mills in Tianjin, 16 blast furnaces, and the total design capacity of blast furnace was 20.3 million tons. At present, 11 blast furnaces are normally produced, and 5 blast furnaces are discontinued. According to the work plan of industrial enterprises in the 2018-2019 heating season of Tianjin, we investigated the production limit rating and actual production limit of various steel companies:


According to the construction of the above-mentioned steel mills, it is estimated that the actual operating rate of the 7 parent flow steel mills in Tianjin is 70 %.

2, rolling line survey samples involved building materials, wire, medium thick plate, strip steel, profile, seamless pipe a total of six varieties, a total of 29 rolling lines.
There are 5 building materials production lines(thread, round steel production lines), 3 normal production, the main production round steel, the discontinued 2 are long-term suspension of production, not affected by the heating season production limit.
There are 6 wire production lines(high lines, variety lines), 2 normal production, and the main production variety lines, 4 discontinued production is a long-term suspension of production, not affected by the heating season production limit.
The production line of medium thick plate is 1, and the output is slightly below the normal level.
There are 8 steel production lines, 7 normal production lines, and 1 production line upgrade.
There are 3 profiles and 1 line production.
Seamless tube production line 6, 1 normal production, adjustment of blank rolling material.

HomeBrief IntroductionOrganizationLetter Bridge NewsProduct CenterAptitude HonorHuman ResourcesContact Us

Mailbox:taxinqiao@163.com    Website:m.yx1716.com
Shandong Xinqiao Industrial Co., Ltd.  Copyright         Technical support:Nuodun Network
Headquarters:0538-8151706    Fax:0538-8151704 Address:The new North Road of the steel market of Tai'ant
Branch:0538-5018001      Fax:0538-5018004 Address:Tai'an national Mountain Center

靖州| 黄山市| 太白县| 临汾市| 宁化县| 新安县| 高要市| 新津县| 宜昌市| 龙海市| 盖州市| 莫力| 噶尔县| 祁东县| 临桂县| 宜君县| 固镇县| 涞水县| 天津市| 达州市| 滁州市| 贵定县| 克山县| 鹤庆县| 阜新市| 台前县| 措勤县| 社会| 定远县| 驻马店市| 黄大仙区| 广水市| 隆林| 木兰县| 安丘市| 双柏县| 石楼县| 桦川县| 伊春市| 互助| 武安市|